Project Name | Project Location | Project Description |
Miscellaneous Alterations to Main Lock | Melvin Price Locks and Dam #26 | This project included steel repair to the dam tainter gates, painting of tainter gates and misc. painting, handrail and check-post replacement, and waterproofing of monoliths. The gates were accessed by use of a marine plant. |
Lock Operating Machinery Install | Lock and Dam No. 7 | This project included concrete demolition and replacement, lock gate machinery demolition and replacement, and electrical renovation. A 250-ton truck crane was used to access the work areas. |
Renovate Spillway Tainter Gates | Big Bend Dam, SD | This project included the addition of structural members to the spillway tainter gates, sandblasting and painting the tainter gates, lead based paint abatement, and cathodic protection on the gates. |
Paint and Refurbish Cranes | Albeni Falls Dam, ID | This project included water blasting and painting (3) gantry style cranes, updating the electrical, and making misc. steel and mechanical repairs to the cranes. |
Modifications to Floodway Bulkheads | Locks and Dam #2, Monongahela River | This project included electrical refurbishment, concrete removal and repairs, sandblasting, lead abatement, painting of bulkheads and the control structure, replace seals on bulkheads, steel modifications to bulkhead structure including replacement of all cables and guide rollers, and alignment of bulkhead rails. We used a marine plant to remove and transport the bulkheads and control structure to our work area and to reinstall the units after refurbishment. |
Lock Operating Machinery Install | Lock and Dam # 9 | This project included concrete demolition and replacement, lock gate machinery demolition and replacement, and electrical renovation. A 250-ton truck crane was used to access the work areas. |
Renovate Tainter Gates | Fort Randall Dam, SD | This project included sandblasting and painting of (21) spillway gates it also included installing additional structural members on the gate arms. We used a truck crane, scaffolding, and power stages to access the work areas. |
Replace Emergency Gate Guides | Tuttle Creek Lake, KS | This project includes removal and replacement of emergency gate guide rails, de-watering, and grouting. We used swing staging to access the work areas. |
Replace Heat Pumps | Fort Randall Dam, SD | This project consists of the removal of three existing heat pumps and associated piping and the installation of three new heat pumps, new piping, insulation, and electrical hookups. |
Rehabilitate Radial Gate | Shadehill Dam, Lemmon, SD | This project consisted of replacing the radial gate seals, sandblasting and painting the radial gate, walkways and ladder system. |
Tow Haulage System | Murray Lock and Dam | This project consists of providing and installing a barge tow hauling system. We supplied and installed approx. 2,400 feet of rail. We also installed the winch systems, air tanks and air piping, lead removal and painting, and concrete work. |
Paint Draft Tube Gantry Cranes | Fort Randall Dam, SD | This project consisted of lead abatement total containment and painting of one draft tube gantry crane. |
Replace Heat Pumps | Gavins Point Dam, SD | This project consisted of the replacement of three heat pump units and two air handling units. The project included electrical, fiberglass and steel piping, and sheet metal work. |
FCWB Welding Building Hoist | Fountain City, WI | This project consisted of a design build 10-ton overhead crane system including electrical and support steel. |
Replace Flashboards and Tiltboard Systems | Stillwell Dam, OK | This project consisted of removing and replacing the wood flashboards and tiltboards on top of a concrete dam structure. |
Keystone Dam Floating Bulkhead | Keystone Dam, OK | This project consisted of fabricating a floating bulkhead in sections, engineering and fabricating a holding stand, welding and assembling the bulkhead on site, and placing the bulkhead into the reservoir using two large capacity cranes |
Gate Equipment Rehabilitation | Cowanesque Dam, PA | This project consisted of replacing the gate cylinders on 8 gates, the underwater installation of a bulkhead sealing plate system for the gates, aligning and misc. repairs to the gates, electrical and hydraulic work. |
Refurbish Slide Gates | Nimrod Dam, Arkansas | This project consisted of removing 9 control gates along with the gate hydraulic cylinders. The gates and gate frame liners were sandblasted and painted with coal tar epoxy paint. The hydraulic system was drained a filtration system installed and new hydraulic fluid installed. |
Repair Hanger Doors | South Dakota Air National Guard | This project consisted of repairing hanger doors, including roller replacement, door seal replacement, brake motor replacement, and door adjustment on three separate hangers. |
Paint Service Gate Frames, Liners, and Guides | Blue Mountain Dam, Arkansas | This project involved sandblasting and painting the gate frames, liners, and guides for three flood gates. |
Rehab Hoisting Yoke and Eye Bar Chain | Garrison Dam, North Dakota | This project involved replacement of eye bar chains and hoisting yokes. It also included lead paint abatement, sandblasting, and vinyl coat painting. |
Hanger Door Hardware Rehab | United States Coast Guard | This project involved replacing the hanger door bottom roller assemblies, the door safety edging, and a full door inspection with misc. repairs. |
Rehabilitate Flood Gates | Whitney Point Lake, NY | This project involved sandblasting, painting, and repairs to 4 floodgates |
Monorail Crane Replacement | John Martin Dam, CO | This project involved replacing the stop-log monorail crane, lead abatement on existing stop-logs, weld inspection of existing stop-logs, building new stop-logs, blast clean and vinyl painting the new stop logs, and tainter gate chain repairs. |
Paint and Rehab Draft Tube Gates | Bull Shoals Dam, AR | This project involved repairing four draft tube gates. The work included lead abatement, painting, steel repair, and seal replacement. |
Install Sluice Gate | Mansfield, PA Pump Station #2 | This project consisted of installing a manual operated sluice gate in the inlet pipe of a pump station. |
Flood Gate Rehabilitation | Whitney Point Lake, NY | This project consisted of replacing one flood-gate sheave assembly and touch up painting. |
Penstock Rehabilitation | Keystone Dam Powerhouse, OK | This project consisted of replacement of a 29’ diameter penstock coupling. It also included realignment of the penstock pipes in order for the coupling to fit, sandblasting and painting inside and outside of the penstock pipe, and epoxy injecting grout into the concrete around the penstock pipe. |
Replace Low Flow Valves | Canton and Ft. Supply Dams, OK | This project included replacing two 2’ diameter low flow valves at Canton Dam and two 3’ diameter low flow valves at Ft. Supply Dam. We used a divers to install rubber plugs with an engineered hold back system to block the flow of water so we could replace the valves. |
Texoma Power Intake Gate Rehabilitation | Texoma Lake, OK | This project include supplying and replacing side chains on the power gates. It also included replacing the gate seals in the conduit and repairing cavitation in the conduit concrete walls. |
Spillway Radial Gate Painting | Norton Dam, KS | This project included sandblasting and painting (3) radial gates and replacing the side and bottom seals on the gates. |
Rehab and Paint Tainter Gates | Table Rock Dam, MO | The scope of work for this project consisted of repairing ten tainter gates, including bulkhead placement, removal and replacement of the gate trunnion pins, reinforcing the gate arms, straightening bent gate members, replacing the side seals, lead paint removal, blast cleaning and painting the gates including using a marine plant to store the blasting and painting equipment, and replacing the gate operating chains with a new cable system. |
Tainter Gate Chain Replacement | John Martin Dam, CO | This project consisted of fabricating and installing new gate operating chains and guides on 16 tainter gates. |
Installation of Replacement Gate Leaf | Ruedi Dam, CO | This project consisted of placement and removal of bulkheads underwater using divers and floating plant with a hydraulic crane. Demolition of existing elevator support steel and hydraulic piping in a 220’ shaft. Engineering and removal of the gate operating hydraulic cylinder, reconditioning of gate leaf seals, replacement of the gate leaf, replacement of the cylinder hydraulic lines, and addition of electrical conduit from the control room to the hydraulic cylinders. Engineering and installing an electrical man-basket to be used in the shaft and engineering, fabrication, and installing steel cover over the shaft opening. |
Rehabilitation and Painting of Sluice Gates | Toronto Dam, KS | This project consisted of placing bulkheads in the water to close off the conduit flow. Removal and reinstallation of the sluice gate hydraulic operating equipment. Removal and replacement of the sluice gates. Lead abatement, sandblasting, and vinyl painting of six sluice gates and conduit liners. |
Paint Service Gates and Liners | Council Grove Lake Dam, KS | This project consisted of blast cleaning and painting two service gates, one emergency gate, and two conduit liners. Including replacing the service and emergency gate seals and anodes. The water leakage in the conduit had to be controlled by installing temporary dams and pumps. The roller chain guards, roller chains, and sheaves were dismantled prior to painting. |
Sluice Gate Painting and Rehabilitation of Seals | Fort Gibson Dam, OK | This project consisted of lead abatement and painting of the sluice gates and conduit liners. Replacing the brass seals on the gate and in the gate frame. Field machining the bottom of the sluice gates. Performing Babbitt repair and field machining of the Babbitt for the bottom seal in the gate frame. The gate cylinders and bonnets had to be disassembled in order to remove the gate from the conduit for repair. |
Repair and Paint Lower Miter Gates | Robert S. Kerr L&D 15, OK | This project consisted of cutting out corroded steel members, fabricating and welding in new steel members. Blast cleaning and painting the downstream lock miter gate. Installing new cathodic protection on the gate. Repairing the belzona seals on the gate. |
Rehabilitation of Service Intake Gates | Wister Lake Dam, Ok | This project consisted of replacing the bottom brass gate seal in the conduit gate frame. The seal was bolted in horizontally and had to be sawed out in pieces. The new seal was drilled and tapped into the conduit lining in the vertical position. Dams had to be installed on both sides of the seal and pumps were set up on the upstream side. One low flow valve along with associated piping, supports, and grating were replaced. The gates were painted and weld repairs were performed. |
Rehabilitation and Painting Sluice Gates | Fall River Lake Dam, Kansas | This project consisted of placing bulkheads in to close off the conduit flow. Removal and reinstallation of the sluice gate hydraulic operating equipment. Removal and replacement of the sluice gates. Lead abatement, sandblasting and vinyl painting of seven sluice gates and conduit liners. |
Tainter Gate Rehabilitation | Marion Lake Dam, KS | This project consisted of blast cleaning and painting three tainter gates, replacing the side and bottom seals on the gates, weld repair, replacing cathodic protection, and replacing seals on nine bulkheads. |
Replace Hatch Covers | Hulah and Ft Gibson Lake Dams, OK | This project consisted of supplying and installing new road hatch covers on top of two dam roads. The work included traffic control, cleaning and painting the hatch cover frames and superstructure, installing new hatch covers, and sealing the covers. |
Repair of Tainter Gate Seal Plates and Eroded Concrete Surfaces | W.D. Mayo Lock and Dam No. 14, OK | This project consisted of replacing the tainter gate seal plate that is embedded in the concrete weir below the tainter gate, replacing the eroded concrete on the gate weir, installing a seal on the bottom of the gate, painting the bottom 3-foot of the gate, installing upstream stop logs, engineering, fabricating, and installing downstream stop logs. |
Tainter Gate Repair | Waterbury Dam, VT | This project consisted of replacing the embedded side seal plates on one tainter gate and replacing the side seals and gate side guide rollers on three tainter gates. This included jack hammering out the embedded seal plates, installing the new seal plates, engineering and installing formwork and placing concrete in the forms. |
Spillway Gate Repairs | Folsom Dam, CA | This project consisted of replacing radial gate seals, inspecting and aligning existing fall protection systems, designing, furnishing, and installing safety closures and ladder-guards at the ends of gate catwalks, performing spillway bridge repairs using an under-bridge unit, spot painting the gates, painting the gate operating machinery, and replacing the guardrail on the upper deck of the dam. |
Roller Chain Installation | Oahe Dam, SD | This project consisted of replacing, removing existing, and reinstallation of 4 new roller assemblies on each of 6 large hydro-power gates for a total of 24 chain assemblies. |
Repair of Intake Bulkheads and Spillway Stoplogs | Harry S. Truman Power Plant, MO | This project consisted of weld repairs and spot painting of two intake bulkheads and 8 spillway stoplogs. |
Replace Raw Water Intake Strainers | Oahe Dam, SD | This project consisted of supplying and installing seven water strainers at the Oahe Power Plant. Other work included removing of existing strainers, installing a butterfly valve onto the strainer, pipe fitting, pipe insulation, and painting. |
Rehabilitate Auxiliary Tow Haulage, Locks 3, 4, 5, & 6 | Locks 3, 4, 5, & 6 Arkansas River | This project consisted of supplying and installing auxiliary winch systems to pull barges into the lock chambers at locks 3, 4, 5, & 6 on the Arkansas River. The winch systems were pneumatic Ingersoll Rand winches. The project included fabricating and mounting winch stands, air piping, and electrical work. |
Reinforce Bridge Girder | Tenkiller Lake Dam, OK | This project consisted of reinforcing one dam bridge girder beam. This included fabricating a reinforcing plate, setting scaffolding, blast cleaning and painting the bridge girder and reinforcing plate, installing the reinforcing plate by heat expansion, and performing strain gauge readings on the girder. |
Spot Paint Gantry Cranes | Oahe Dam, SD | This project consisted of lead abatement and spot painting two gantry cranes at the Oahe Dam Powerhouse. |
Replace Tainter Gate Flat Wire Rope | Tenkiller Lake Dam, OK | This project consisted of replacement of flat wire rope and connecting pins on ten tainter gates, two wire ropes per gate. The existing wire rope pins were removed by torch cutting and jacking. The new wire ropes were installed, synchronized, test operated, and the limit switches were re-set. |
Rehabilitate and Paint Tainter Gates | John Redmond Lake Dam, KS | This project consisted of rehabilitation and painting two tainter gates. The work included setting of bulkheads, controlling water leakage, white metal blast cleaning, gate weld inspection and repair, coating the gates with system no. 5-E-Z vinyl paint, replacing the gate side and bottom seal assemblies, replacing cathodic protection, tension adjusting the gate operating cables, and synchronizing the gates. |
Gate Rehabilitation and Penstock Coating | Seminoe and Kortes Dams, WY | This project consisted of rehabilitation and painting of six ring follower gates. The work included setting bulkheads, water control, remove gate operating cylinders and drive systems, removal of gates, heavy lifting crane work, replacement of gate and conduit frame seals, field machining conduit frame seals, lead abatement, containment, weld repairs, and cold tar epoxy painting the gates and penstocks, reinstall gates and operating machinery, and gate testing. |
Radial Gate Rehabilitation | Headgate Rock Dam, AZ | This project consisted of rehabilitation of 10 radial gates. This included installing new J-bulb seals on the stoplogs, setting the stoplogs, water control, removal of gates with a crane, lead abatement by containment and blast cleaning, structural repair and weld repair, painting, gate seal replacement, trunnion pin and bushing replacement, seal plate replacement, wire rope replacement, synchronizing the gate, setting limit switches and testing. |
Replace Sluice Gates | Tygart Lake Dam, WV | This project consisted of providing and installing 7 new sluice gates. This included setting a bulkhead, dewatering, removal of the hydraulic operating cylinder and bonnet cover, removal of the existing sluice gate, gate seats, babbitt seal, and sill assemble. Removal and replacement of two gate frame cavitation plates. Blast cleaning and painting the inside of the bonnet and bonnet cover. Reinstallation of a new sill assembly including a babbitt seal and field machining the babbitt seal. Installation of new gate seats, new gate, and existing gate operating cylinder. Blast cleaning and painting two low flow valves. Handrail modification and trench cover fabrication and installation. |
Plug One Sluice Gate | Canton Lake Dam, OK | This project consisted of installing a concrete plug in one sluice gate conduit to reduce future maintenance work. This included moving sluice gates and operating machinery to other conduit locations, installing a steel cover over the air vent opening, replacing the operating machinery wire ropes on 4 units, electrical work, and installing a new roof system on three control house buildings. |
Radial Gate Repairs | Nimbus Dam, CA | This project consisted of rehabilitating three radial gates. This included installation of a articulating bulkhead, dewatering, full containment, lead abatement, blast cleaning and painting, weld repairs, installing new wire rope and wear pads, new gate seals, refurbishing side guide shoes, and designing and installation of a cathodic protection system. |
Rehabilitation and Painting of Tainter Gates | Kaw Lake Dam, OK | This project consisted of rehabilitating two tainter gates and stoplogs. This included weld repair and painting stoplogs, traffic control, installation of stoplogs, dewatering gate bay, blast cleaning tainter gates, weld and pit repair, painting tainter gates, installing new gate seals, cathodic protection, and installation of new tainter gate wire rope assemblies. |
Rehab Intake Gates | Gavins Point Dam, NE | This project consisted of rehabilitating 10 intake gates and 1 bulkhead gate. This includes scaffolding installation, installing a ventilation system, blast cleaning, painting, and roller chain rehabilitation. |
Head Gate Rehabilitation | Keystone Lake Dam, OK | This project consisted of rehabilitating four intake gates, dogging devices, and cable blocks. This included engineering a crane placement plan, removal of the intake gates from the dam, blast cleaning, weld repair, painting, fabricate and install new roller chains, furnish and install new J-bulb seals, furnish and install cathodic protection, reinstallation of the gates, and testing. |
Hatch Cover Sealant | Ft Gibson Lake Dam, OK | This project consisted of replacing the joint sealant on the dam bridge hatch covers, fixed deck joints, and expansion deck joints. This included traffic control, removal of existing joint material, concrete repair, blast cleaning the joints, and installing new joint sealant. |
Replace Tainter Gate Chains | Hulah Lake Dam, OK | This project consisted of replacing gate operating chains on 10 tainter gates and replacing the brakes on 10 tainter gate drive assemblies and fully refurbishing 2 tainter gate brake assemblies. This included traffic control, crane placement plan on the dam bridge, fabricating new tainter gate chains, installing the new chains, synchronizing the gates, and setting limit switches. |
Replace Low Flow Valve | Ft Supply Lake Dam, OK | This project consisted of replacing one low flow butterfly valve with a knife valve. This included using divers to install a rubber plug in the upstream side of the low flow pipe, installing a new knife valve along with new pipe spool sections, and electrical hookups. We also replaced the gantry crane lifting hook. |
Rehabilitate and Paint Power Intake Gates, Draft Tube Gates, and Bulkheads | R.S. Kerr Powerhouse, OK | This project consisted of rehabilitating 4 intake gates, 6 draft tube gates, and 6 bulkhead gates. This included removal of gates using cranes, containment, lead abatement, blast cleaning, weld repair, painting, new gate rollers, new gate seals, cathodic protection, re-installation, and testing. |
Oklahoma Area Maintenance Projects | Webber Falls L&D #16, Webber Falls Powerhouse, R.S. Kerr L&D #15, & Broken Bow Lake, OK | This project consisted of rehabilitating the lock tainter valves at L&D #15 & #16, painting transformer equipment at Webber Falls Powerhouse, and rehabilitating the service bridge and removal of trash rack debris at Broken Bow Lake. The tainter valve repair consisted of setting bulkheads, dewatering, removal of the valves, blast cleaning, steel repair, painting, cathodic protection, new J-bulb seals, reinstallation of the valves, and testing. The broken bow service bridge work included, scaffolding, cleaning and painting service bridge, provide and install expansion joint gutters and scupper extensions, scarify top of bridge deck, and treat concrete with penetrating water repellent. The trash rack debris removal consisted of using divers to remove the debris, load it on a work boat, and burn the wood debris. |
Replace Tainter Gate Hoisting Connections | Beaver Lake Dam, AR | This project consisted of removing the existing tainter gate wire rope to gate connections, furnishing new connections, and installing the new connections. This included setting bulkheads, water control, removal of gate connectors, blast cleaning and painting the gate lugs and new connectors, installing the new connections, wire rope tensioning, and setting gate limit switches. |
Replacement of Wire Ropes | Keystone Dam, OK, Eufaula Dam, OK, Hugo Dam, OK, and Marion Dam, KS | This project consisted of replacing the wire rope at Keystone, Eufaula, Hugo, and Marion dams. Including setting bulkheads, water control, removing the existing wire ropes, replacing with Government supplied wire ropes, adjusting the tension, and setting the limit switches. |
Replace Service and Emergency Gates | Pine Creek Lake, OK | This project consisted of replacing two service gates and two emergency gates. This included furnishing new service and emergency gates, furnishing new gate stems, removal of the gate hydraulic operating system, removal of gates, replacement of gate frame seals, installation of new gates, installing the new gate systems, and reinstalling the existing hydraulic operating system. We also replaced the air vent grading and repaired the conduit hatch covers. |
Gate Stem Replacement | Jennings Randolph Lake, WV | This project consisted of rebuilding two service gate and two emergency gate hydraulic operating cylinders and refurbishing two low flow valves and rebuilding the cylinders. This included setting a bulkhead, dewatering, engineering and installing a gate support system, cylinder removal, refurbishment, and reinstallation. Rebuilding the cylinders including new stem shafts, bushings, piston rings, boring out the cylinders, and new seals and packing. |
Repair Sluice Gate and Frame Seals | Tenkiller Lake Dam, OK | This project consisted of removing the existing sluice gate and sluice gate frame seals, re-machining the seals flat and true, blast cleaning and painting under the seals, re-installing the seals, and testing the adjusting the sluice gates for proper operation. |
Temperature Control Device (TCD) Wire Rope Replacement | Shasta Lake Dam, CA | This project consisted of replacing the wire rope and connecting links on (17) TCD gates. This included furnishing new wire rope and links, removal of existing wire rope and connecting links, installation of new wire rope and connecting links, adjusting and testing the wire ropes and gates, touch up painting, and traffic control. |
Repair Flood Control Tunnel Outlet Works Gates | Oahe Dam, SD | This project consisted of providing and installing new outlet works gate chains on four service gates. Replacing cathodic protection on four service gates and two emergency gates and sheaves. Replacing the seal assembly on one service gate. Repairing the guide rail on one service gate slot. |
Replace Service Gate, Wire Rope, and Repair Well Liner | Oologah Lake Dam, OK | This project consisted of replacing service gate no. 4, replacing and field machining the gate frame seals, repairing the well liner, replacing the low flow valve, replacing the fill valve operating extension, and replacing the wire rope on service gates 1, 2, 3, and 4. |
Rehabilitate and Paint Levee Gates and Levee Discharge Conduits | Cleveland Levee, Cleveland OK | This project consisted of rehabilitating six slide gates which included disassembly, blast cleaning, weld and pit repair, seal refurbishment, painting, new gate stems and hardware, and reinstallation. Rehabilitating six flap gates including removal, blast cleaning, pit repair, seal repair, painting, and reassembly. Four conduit pipes were slipped lined. |
Replace Tainter Gate Chains | Norfork Dam, AR | This was a design build project to replace the (12) tainter gate operating chains with a wire rope operating system. This included removal of the existing operating chains, chain sprockets, and chain attachment lugs to the gate. Installing new wire rope sheaves, new gate hitch blocks, and new wire ropes. Tensioning the wire ropes and setting the limit switches. Blast cleaning and painting the new hitch block assemblies. |
Replace Service Gate #3 | Oologah Lake Dam, OK | This project consisted of replacing service gate no. 3, replacing and field machining the gate frame seals, replacing and painting the well liner, replacing the fill valve extension, and rehabilitating the lower sheave assembly. |
Replace Emergency and Service Gates | Sardis Lake, OK | This project consisted of replacing two service gates and two emergency gates including rehabilitating the hydraulic cylinders and hydraulic system, blast cleaning and painting the conduit frames, liners, and stems, replacing the gate guides, weld pit repair, setting bulkheads, dewatering, and controlling water. |
Replace Flood Gates & Steel Turntable | Lake Texoma – Denison Dam, TX | This project was a design build project to design and install three new floodgates including replacing the gate frame seals and the gate guide bars. The project also consisted of furnishing and installing a new rail turntable at the powerhouse. |
Conduit and Parabolic Spillway Repairs | Addicks and Barker Dams, TX | This project consisted of repairing conduit expansion joints and parabolic repairs to both Addicks and Barker dams. This included, dewatering water control, expansion joint repairs, anchoring heavy steel plates to the spillway concrete using adhesive Hilti anchors. |
Repair 10 Tainter Gates – Hatch Covers | Tenkiller Lake Dam, OK | This project consisted of rehabilitation and painting of 20 sets of hatch covers on the dam bridge, rehabilitating 11 sets of bridge expansion joints, rehabilitation and painting of the tainter gate operating hoist platforms, blast cleaning and painting the downstream sides of 10 tainter gates, spot painting the upstream side of 10 tainter gates, heat straighten two tainter gate bent flanges, weld repairs, and tensioning the flat wire ropes on 10 tainter gates. |
Replace Service Gate #2 and Repair Well Liner | Oologah Lake Dam, OK | This project consisted of replacing service gate no. 2 and no. 1, replacing and field machining the gate frame seals, replacing and painting the well liner, replacing the fill valve extension, and rehabilitating the lower sheave assembly. |
Spillway Gate Rehabilitation | Ft Randall Dam, SD | This project consisted of rehabilitating 24 tainter gates. This included, wire rope replacement, side and bottom gate seal replacement, cathodic protection replacement, and weld repairs. |
Spillway Gate Rehabilitation | Gavins Point Dam | This project consisted of rehabilitating 14 tainter gates. This included, wire rope replacement, side and bottom gate seal replacement, cathodic protection replacement, weld repairs, and gate operating gear box refurbishment. |
Replace Bascular Gate Seals | Dickinson Dam, ND | This project consisted of replacing the 200’-8” long bottom seal on one bascular gate and the two 4’ long side seals. |
Replace Stem and Repair Stem Guide on Gate #3 | Mississinew Lake, Peru, IN | This project consisted of replacing gate operating stems and bushings on gate no. 3 and replacing access ladders in two gate wells. |
Replace Gate Chamber Ladders and Landings | Heart Butte Dam, ND | This project consisted of replacing the fabricating new ladders and landings, providing traffic control, removing the existing ladders and landings, and installing new ladders and landings. |
Rehab Outlet Works Regulating Gates Number 5 & 6 | Oahe Dam, SD | This project consisted of removing two hydraulically operated Outlet Work gates from the gate slots, rehabilitating them on site, reinstalling them back in the slots, reinstalling the hydraulic operator system, and conducting leak testing. Rehabilitation of the gates included blasting and painting by a QP-1 and QP-2 certified painting subcontractor, use of a Class I containment system for abrasive blasting, removal and refurbishment of all gate wheels, installation of new gate seals, CWI inspection of the gates along with completion of identified weld repairs, and replacement of the rod anodes and anode supports. Painting of the Outlet Works conduit liners was also included in this project. This required setting an emergency gate, water control in the conduit, and blasting and painting of the liner. |
Replace 2 Flood Gates & Rehabilitate Frame Liners | Lake Texoma – Denison Dam, TX | This project was a design build project to design and install two new service gates, install new gate frame steel liners, rehabilitate conduit liners, patch concrete in stilling basin downstream of splitter wall, and paint repair on three gates. |
Denison Powerhouse Crane – Gearbox Rehabilitation | Lake Texoma – Denison Dam, TX | This project consisted of removing, rebuilding, and reinstalling 7 gearboxes on the powerhouse 225 – ton bridge crane. This included precision laser alignment, dynamic balancing of the hoist motors, gear oil replacement, and gear alignment. |
Miscellaneous Improvements Project | Morris Sheppard Dam, TX | This project involved removal and replacement of piping and valves that operate the bear trap style flow control gates at the dam. It also included construction of a new access stairway as well as railing replacement and electrical upgrades. The project required a coordinated water supply shutdown with the downstream fish hatchery. |
Penstock Expansion Joint Packing Replacement | Pole Hill Penstock, CO | This project involved removal and replacement of expansion joint packing on a 96″ diameter penstock on a steep mountainside. |
Replace Discharge Valves | Iron Bridge Dam, TX | This project involved removal and replacement of two 20″ butterfly valves with 20″ motor actuated knife gate valves and associated piping. Since the valves control water supply flow to downstream communities the work needed to be performed at night within a limited time shutdown window. |
Replace Flood Gate 16 and Emergency Gate | Lake Texoma – Denison Dam, TX | This project was a design build project to design and construction of flood gate No. 16, gate frame liner from floor elevation to two feet above conduit head height, emergency gate, dogging devices for service gates 7 – 10, movable work platform, replace form plate, repair concrete surfaces, and all appurtenances. |