Alltech has been awarded the Upper St. Anthony Falls Tainter Gate Machinery Replacement project at Upper St. Anthony Falls Lock and Dam in Minneapolis, Minnesota by the Army Corps of Engineers. The project includes blasting and painting of the lock’s upper miter gates and tainter gate, replacement of the existing tainter gate hoist system, and construction of two new machinery buildings to enclose the tainter gate hoists.
November 2, 2017
Alltech Engineering Awarded the Upper St. Anthony Falls Tainter Gate Machinery Replacement Project
Read More
September 27, 2017
Alltech Awarded Spillway Gate Hoist Wire Ropes Project at Big Bend Dam
Alltech has been awarded the Install Spillway Gate Hoist Wire Ropes project at Big Bend Dam in South Dakota by the Army Corps of Engineers. The project includes replacement of the 80 wire ropes that raise and lower the eight spillway tainter gates. Recoating the 80 drum discs is also included in this project.
July 20, 2017
Intake Gate Gearbox Rehabilitation project at Big Bend Dam
Alltech has been awarded the Intake Gate Gearbox Rehabilitation project at Big Bend Dam in South Dakota by the Army Corps of Engineers. The project includes complete refurbishment of the 24 gearboxes that operate the power plant’s intake gate hoists. Replacement of the electrical feeders and breakers is also included.