October 5, 2018
Alltech Completed Spillway Gate Hoist Wire Ropes project at Big Bend Dam
Alltech has completed the Install Spillway Gate Hoist Wire Ropes project at Big Bend Dam in South Dakota by the Army Corps of Engineers. The project included replacement of the 80 wire ropes that raise and lower the eight spillway tainter gates. Recoating the 80 drum discs was also included in this project.